Federal Contract Opportunity

Last Updated on 12 Jun 2025 at 8 PM
Solicitation
San juan Puerto rico

CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION

Details

Solicitation ID W51DQV25RA004
Posted Date 12 Jun 2025 at 8 PM
Response Date 07 Jul 2025 at 3 PM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office W2sr Endist Caribbean(provis)
Agency Department Of Defense
Location San juan Puerto rico United states 00918

Sign up to access Documents

Signup now
This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Material Management Area (MMA), dredging of the Aquatic Disposal Pit (ADP) SJ1A with disposal at ADPs SJ2A, SJ3, and SJ4/5, dredging of 3,000 meters-long access channel across San Jos� Lagoon (SJL), bridge fenders to protect the concrete piers of the Moscoso Bridge near the SJL access channel, dredging of 450 meters-long transition channel between main channel and SJL access channel, dredging of 900 meters long main channel from the Barbosa bridge to San Jose Lagoon transition channel as a wall-stabilized channel composed of steel sheet pile walls with concrete cap along main channel with natural bottom, and construction of an approximately 61 meters-long riprap channel at the Barbosa Bridge to protect the foundation from scour associated with reestablishing flow through the CMP. Amendment 0001: Pre-proposal conference/ Site visit has been amended and changed from May 1, 2025, to May 15, 2025. See amendment 0001 for Site visit instructions.