Federal Contract Opportunity

Last Updated on 08 Jul 2025 at 8 AM
Solicitation
Mechanicsburg Pennsylvania

CABLE ASSY

Details

Solicitation ID N0010425QYK54
Posted Date 08 Jul 2025 at 8 AM
Response Date 06 Aug 2025 at 8 PM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Navsup Weapon Systems Support Mech
Agency Department Of Defense
Location Mechanicsburg Pennsylvania United states 17050

Possible Bidders

Sikorsky Aircraft Corporation

Rochester Shelton Jacksonville West haven Stratford Bridgeport Jupiter Fort worth

Supplycore Incorporated

Rockford Santa fe springs North kansas city Atlanta

Ww Grainger Incorporated

Cleveland Anchorage Lake forest Boston Atlanta Chula vista Saint louis Niles

Rev-cap Company Incorporated

Maple shade West berlin

Lockheed Martin Corporation

Saint paul Eatontown Oldsmar Manchester Camden Kekaha Johnson city Hudson Santa margarit Harlingen Moorestown Honolulu Las vegas Boulder Littleton Santa maria Grand prairie Ocala Greenbelt Bellevue Aurora Chambersburg Tinton falls Goleta Kailua Norfolk San antonio Glenside Clarksburg Rcho sta marg Lanham Arlington Troy Killeen Owego Aberdeen proving ground Fort bliss Sunnyvale Gulfport Alpharetta Seabrook Archbald Nashua Gilbert Atlanta Herndon Hoffman estates Baltimore Pomona Centreville Ontario North las vegas Manassas Horsham Liverpool Syracuse Malvern Orlando Chantilly Cherry hill Oak ridge New orleans Riviera beach Cape canaveral Americus Hoffman estate Sarasota Fort worth Colorado sprin Lexington Springfield Ventura Goodyear King of prussia Akron Houston Utica Bethesda Chelmsford Pinellas park Palo alto Burlington Irvine White sands missile range Great neck Merrimack Washington Courtland Bay saint louis Milpitas Johnstown Hightstown San jose Uniondale Titusville Gaithersburg Huntsville Palmdale Santa clara Falls church Yonkers Chesapeake Rockville Warner robins Hurlburt field Eagan Hanover Virginia beach New york Santa cruz San diego Austin Niagara falls Colorado springs Reston King of prussi Marietta Newtown Syosset Fairfax Burbank Mount laurel Buellton Papillion

Sign up to access Documents

Signup now
CONTACT INFORMATION|4|N741.P18|ER6|771-229-2023|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|ISO9001| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO||TBD|N00104|TBD|TBD|SEE SCHEDULE|SEE SCHEDULE|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| LIST OF SOLICITATION ATTACHMENTS|5||||X|X| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|335931|600 emp|||||||||||| INSTRUCTIONS TO OFFERORS -- COMPETITIVE ACQUISITION (NOV 2021)|2||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| This procurement requirement is for quantity 18 CABLE ASSY (NSN 1HM 5995 016608480). This requirement is 100 Percent set-aside for small businesses. The Government will issue an award resulting from this Request for Quotation (RFQ) to the responsible offeror whose quotation, conforming to the solicitation, results in the best value to the Government, considering both price and non-price factors. The following factors will be used to evaluate competitive offers received in response to this RFQ: 1. Price 2. Non-Price Factors 1. Delivery Lead Time. The proposed delivery lead times and schedules will be evaluated and the proposed delivery lead time considered to be in the best interest of the Government will be rated higher than other delivery lead times proposed. 2. Past Performance. The offeror's past performance on related contractswill be evaluated to determine, as appropriate, successful performance ofcontract requirements, quality and timeliness of delivery of goods andservices, cost management, communications between contracting parties, proactive management, and customer satisfaction. All non-price evaluation factors, when combined, are approximately equal to price. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. \ 1. SCOPE 1.1 ;This procurement specification contains the requirements for manufacture and the contract quality requirements for ;AN/BRR-6 Outboard Cable Assembly (2W1); for use on Navy submarines.; 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.1.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.1.3 The "Document Changes" section provides supersessions/changes to referenced documents. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DRAWING DATA=8590842 |53711| B| |D| 0001 | B|B4999|8029917 DRAWING DATA=8590854 |53711| -| |D| 0001 | -|-4999|8008004 DRAWING DATA=8603513 |53711| A| |D| 0001 | A|A4999|8066819 DOCUMENT REF DATA=MIL-STD-130 | | |N |121116|A| |01| DOCUMENT REF DATA=MIL-DTL-915 | | |G |100908|A| | | DOCUMENT REF DATA=MIL-STD-973 | | | |950113|A| |03| DOCUMENT REF DATA=ISO9001 | | | |150915|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=MIL-M-24041 | | |C |881220|A| | | DOCUMENT REF DATA=MIL-DTL-24640 |0024| |E |111108|A| | | DOCUMENT REF DATA=MIL-I-24768 |0027| | |920225|A| | | DOCUMENT REF DATA=NCSL Z540.3 | | | |060803|A| | | DOCUMENT REF DATA=MIL-I-45208A | | | |810724|A| | | DOCUMENT REF DATA=EIA-649C-2/19 | | | | |A| | | DOCUMENT REF DATA=SAE-AS28775A 12/08 | | | | |A| | | DOCUMENT REF DATA=SAE-AS23053/1A-03/18 | | | | |A| | | DOCUMENT REF DATA=SAE-AMS2817G - 11/2016 | | | | |A| | | DOCUMENT REF DATA=MIL-DTL-915/48D - 5/31/07 | | | | |A| | | DOCUMENT REF DATA=NAVSEA S9320-AM-PRO-020/MLDG | | |02 |990801|A| | | DOCUMENT REF DATA=NAVSEA S9320-AM-PRO-030/MLDG | | |03 |050201|A| | | DOCUMENT CHANGE DATA=AMS-2817 | SAE-AMS2817G DOCUMENT CHANGE DATA=MS28775E |SAE-AS28775A DOCUMENT CHANGE DATA=SAE-AMS-DTL-23053/1C |SAE-AS23053/1-2018 3. REQUIREMENTS 3.1 ;Design and Manufacturing - The ;AN/BRR-6 Outboard Cable Assembly (2W1); furnished under this contract/purchase order shall meet the material, electrical, mechanical, physical and test requirements as specified on Drawings 8590842 (consisting of Item Numbers 1 thru 20), 8590854 and 8603513, NAVSEA Manuals S9320-AM-PRO-030/MLDG and S9320-AM-PRO-020/MLDG and including associated specifications mentioned in this procurement.; 3.1.1 ;The AN/BRR-6 2W1 Mold Assembly shall be manufactured per the guidance of Drawing 8603513 (consisting of Item Numbers 1 thru 30) as required by Drawing 8590842.; 3.1.2 ;The connector metal plug body (Item No. 10 of drawing 8590842) surface preparation, application and inspection of non-conductive coating (Plasma Coating) shall be in accordance with NAVSEA Manual S9320-AM-PRO-030/MLDG as specified on Drawing 8590854.; 3.1.3 ;The Polyurethane Molding Compound Type II, Color Amber shall be in accordance with MIL-M-24041 requirements as specified on Drawing 8590842.; 3.1.4 ;All outboard molded cable assemblies shall be manufactured and tested in accordance with NAVSEA Manual S9320-AM-PRO-020/MLDG requirements as specified on Drawings 8590842, Note 3 and 8590854, Note 4.; 3.2 ;Vendor Qualification. As required by Drawing 8590854:; 3.2.1 ;Only vendors which are qualified, per the audit requirements of NAVSEA Manual S9320-AM-PRO-020/MLDG Appendix II-A; and listed on the approved vendors lists in appendix II-A of NAVSEA Manual S9320-AM-PRO-020/MLDG, shall be authorized to fabricate submarine outboard cable assemblies. ; 3.2.2 ;Metal plug bodies surface preparation is only by vendors which are qualified, per the audit requirements of NAVSEA Manual S9320-AM-PRO-030/MLDG Appendix III-H, and listed on the approved vendors lists in appendix III-I of NAVSEA Manual S9320-AM-PRO-030/MLDG, shall be authorized to fabricate non-conductive plasma sprayed ceramic coated submarine outboard connector metal plug bodies.; 3.3 ;Marking Requirements- The supplier shall permanently mark and identify each first article and production lot unit ;AN/BRR-6 Outboard Cable Assembly (2W1); in accordance with Notes 9, 10 and 11 of Drawing 8590842 per MIL-STD-130. ; Per Note 25 of Drawing 8590842, the supplier shall contact Jason Krol, [email protected] of NSWC Philadelphia Division for component serial number information.;; 3.3.1 ;The supplier shall mark ;tag or bag; all piece parts with contract, drawing/item, heat, lot or batch and serial number in accordance with MIL-STD-130 until installed in the designated assembly.; 3.4 ;First Article Testing/Inspection - (Supplier Testing/Inspection). The first article testing/ inspection procedure and approval are required for the ;AN/BRR-6 Outboard Cable Assembly (2W1);. Government approval is required prior to commencement of first article unit.; 3.5 ;Notification - The supplier shall notify Naval Surface Warfare Center, Philadelphia Division, (NSWCPD), 5001 S. Broad Street, Philadelphia, PA 19112-1403 by email [email protected], Code 242MO after award of contract.; 3.5.1 ;The NSWCPD is the acceptance activity for the Contract Data Requirements List (DD1423) Data Items. NSWCPD WAWF/IRAPT ;Acceptor; DODACC is ;N64498;.; 3.6 Configuration Control - MIL-STD-973 entitled "Configuration Management", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973, Paragraph 5.4.8.2 and Appendix D. Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E. Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E. (Original and two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.) 3.6.1 Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders until another drawing revision is approved. The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted, the date of the granting of the authorization, and the name of the granting authority. Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below. The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA 17055-0788. Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor. 3.7 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part. The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard. If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned. These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements. Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided: Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface ship atmosphere. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 4.4 ;Inspection System - The Supplier's Quality Inspection System shall be in accordance with MIL-I-45208 or ISO 9001 and NCSL Z540.3 or ISO 10012. The supplier shall develop and submit their written Quality Inspection and Test Plan as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the supplier?s written Quality Inspection and Test Plan is required by the contract. CDRL: QUALITY INSPECTION & TEST PLAN per MIL-I-45208, NCSL Z540.3 and DI-QCIC-81110 ; 4.5 ;Finished Edges - Finished shall be in accordance with the applicable drawing requirements.; 4.6 ;Material Control - The supplier shall have an effective material control system that provides for the control of materials by heat, lot or batch as ordered for first article and production lot units. ; 4.7 ;AN/BRR-6 2W1 Mold Assembly Material/Inspection (Dwg. 8603513) Prior to First Article; 4.7.1 ;The supplier shall provide material certification for 2W1 Mold Assembly, Item Numbers 3 thru 8, 10, 11, 13, 14, 16, 17, 19 and 20 of drawing 8603513 (certifying items to drawing and the applicable material requirements). Records shall be traceable by drawing/item, heat, lot or batch, serial and contract number. CDRL: CERTIFICATE OF COMPLIANCE per DI-MISC-82386; 4.7.2 ;The supplier shall perform visual and physical inspection 100% on each mold machined part (Item Numbers 3 thru 8, 10, 11, 13, 14, 16, 17, 19 and 20) of each dimension identified on drawing 8603513. The supplier shall record the actual measurements and results of each dimension identified on the applicable drawing including the applicable identification and markings required by drawing. The inspection reports shall show all the characteristics, the actu al measurements and results of each dimension inspected, including ide ntification and markings, contract number, name of supplier, drawing/item number, drawing revision letter, heat, lot or batch, serial number, item nomenclature, inspector's acceptance signature and date. CDRL: VISUAL/DIMENSIONAL INSPECTION REPORT per DI-NDTI-80809B; 4.7.3 ;AN/BRR-6 2W1 Mold Assembly Material Certification/Inspection Report and Acceptance - (Supplier Certification/Inspection). The supplier shall submit material certification/inspection report in compliance with the applicable Data Item Descriptions (DIDs) and drawing 8603513. The 2W1 Mold Assembly Material Certification/Inspection Report shall consist of ;Certificate of Compliance for Material and Visual/Dimensional Inspection Report; identified in the above respective paragraphs of this document, and as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the mold assembly material certification/inspection report is required prior to commencement of first article unit. CDRL: AN/BRR-6 2W1 MOLD ASSEMBLY CERTIFICATION MATERIAL/ INSPECTION REPORT per DI-NDTI-80809B; 4.8 ;First Article Testing/Inspection - (Supplier Testing/Inspection). The supplier shall perform first article testing/inspection on ;AN/BRR-6 Outboard Cable Assembly (2W1); in accordance with the applicable drawings and specifications, NAVSEA manuals S9320-AM-PRO-030/MLDG and S9320-AM-PRO-020/MLDG,S9320-AM-PRO-020/MLDG, and their approvedfirst article Procedure.; 4.8.1 ;The first article inspection shall be made by the cognizant DCMA-QAR at the supplier's and/or subcontractor facility. The supplier shall notify NSWCPD, Code 242MO two weeks in advance prior to the scheduled first article testing/inspection, so an NSWCPD representative has the option of being present during the first article testing/inspection.; 4.9 ;First Article Approval for Testing/Inspection Procedure and Acceptance - (Supplier Testing/ Inspection). The supplier shall prepare and submit their First Article Testing/Inspection Procedure for ;AN/BRR-6 Outboard Cable Assembly (2W1); in accordance with the requirements of DI-NDTI-80603, the applicable drawings, specifications, NAVSEA manuals S9320-AM-PRO-030/ MLDG and S9320-AM-PRO-020/MLDG, and as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the procedure is required prior to commencement of first article unit. CDRL: FIRST ARTICLE TESTING/INSPECTION PROCEDURE per DI-NDTI-80603A; 4.10 ;First Article Testing/Inspection - The supplier shall perform 100% examination, inspection and testing on the completed first article ;AN/BRR-6 Outboard Cable Assembly (2W1); unit (bulk cable/component parts/assembly) in accordance with the applicable drawings, NAVSEA manuals S9320-AM-PRO-020/MLDG and S9320-AM-PRO-030/MLDG, and their approved first article procedure. The supplier shall record the actual measurements and results of each examination, inspection and test in NAVSEA S9320-AM-PRO-020/MLDG and S9320-AM-PRO-030/MLDG, and each dimension identified on the applicable drawings.; 4.10.1 ;The supplier shall visually inspect and perform electrical continuity and dc insulation resistance testing 100% on the ;Bulk Cable; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.10.2 ;The supplier shall visually and physically inspect 100% the connectors (Item Nos. 4, 8 and 10 of drawing 8590842) in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.10.3 ;The supplier shall verify and inspect 100% the connector metal plug body (Item No. 10 of drawing 8590842) surface has been prepared and plasma coated in accordance with NAVSEA S9320-AM-PRO-030/MLDG requirements.; 4.10.4 ;The supplier shall visually and physically inspect 100% the completed ;Cable Assembly; of each dimension and keyway location/position identified on Drawing 8590842 including the identification and markings required by Notes 9,10 and 11 of the drawing.; 4.10.5 ;The supplier shall visually inspect 100% the molded plug connectors on the completed ;Cable Assembly; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.10.6 ;The supplier shall perform 100% electrical continuity test on the completed ;Cable Assembly; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.10.7 ;The supplier shall perform 100% insulation resistance test on the completed ;Cable Assembly; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.10.8 ;The supplier shall perform 100% nondestructive bonding test on molded plug connectors on the completed ;Cable Assembly; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.10.9 ;The supplier shall perform 100% hydrostatic pressure test on the completed ;Cable Assembly; including insulation resistance testing in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.11 ;First Article Testing/Inspection Report and Acceptance - (Supplier Testing/Inspection). The supplier shall submit for completed first article unit ;AN/BRR-6 Outboard Cable Assembly (2W1); testing/inspection reports in compliance with the requirements of DI-NDTI-80603, the applicable drawings and specifications, NAVSEA manuals S9320-AM-PRO-020/MLDG and S9320-AM-PRO-030/MLDG. The report shall also include a copy of ;Bulk Cable Inspection/Test Report (Types 2SWF-4 & TTXOW-5 per MIL-DTL-915/48 and MI L-DTL-24640/24); Certificate of Conformance for Materials (Dwg 8590842, Item Nos. 13, 15, 18, 19 & 20); Plasma Coating, Polyurethane Molding Compound, Back Fill and Primer; Certificate of Compliance for Connectors (Dwg. 8590842, Item Nos. 4, 8 &10), RG-58 Cable, Turret and Polychloroprene Material (per MIL-DTL-915); Bulk Cable Inspection/Test Report per NAVSEA S9320-AM-PRO-02 0/MLDG; identified in the Objective Quality Evidence Records Section of this document, and as indicated on the Contract Data Requirements List (DD Form 1423). Government approval of the first article testing/inspection report is required prior to commencement of production units. CDRL: FIRST ARTICLE TESTING/INSPECTION REPORT per DI-NDTI-80809B; 4.12 ;Production Lot.; 4.13 ;Bulk Cable - The supplier shall perform 100% examination, inspection and testing on the production lot (Bulk Cable for Types 2SWF-4 and TTXOW-5 Item Nos. 5 & 6 of drawing 8590842) in accordance with the applicable requirements listed in specifications MIL-DTL-915/48 and MIL-DTL-24640/24 (Quality Conformance Inspection) Basic Electrical, Groups A, B, C and D. The supplier shall record the actual measurements and results of each examination, inspection and test specified in the applicable specifications.; 4.14 ;AN/BRR-6 Outboard Cable Assembly. The supplier shall perform 100% examination, inspection and testing on each completed production lot unit (bulk cable/component parts/ assembly) in accordance with the applicable drawings, NAVSEA manuals S9320-AM-PRO-020/ MLDG and S9320-AM-PR-030/MLDG. The supplier shall record the actual measurements and results of each examination, inspection and test in NAVSEA S9320-AM-PRO-020/ MLDG and S9320-AM-PRO-030/MLDG and each dimension identified on the applicable drawings.; 4.14.1 ;The supplier shall visually inspect and perform electrical continuity and dc insulation resistance testing 100% on the ;Bulk Cable; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.14.2 ;The supplier shall visually and physically inspect 100% each connector (Item Nos. 4, 8 and 10 of drawing 8590842) in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.14.3 ;The supplier shall verify and inspect 100% each connector metal plug body (Item No. 10 of drawing 8590842) surface has been prepared and plasma coated in accordance with NAVSEA S9320-AM-PRO-030/MLDG requirements.; 4.14.4 ;The supplier shall visually and physically inspect 100% each completed ;Cable Assembly; of each dimension and keyway location/position identified on Drawing 8590842 including the identification and markings required by Notes 9,10 and 11 of the drawing.; 4.14.5 ;The supplier shall visually inspect 100% the molded plug connectors on each completed ;Cable Assembly; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.14.6 ;The supplier shall perform 100% electrical continuity test on each completed ;Cable Assembly; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.14.7 ;The supplier shall perform 100% insulation resistance test on each completed ;Cable Assembly; in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.14.8 ;The supplier shall perform 100% nondestructive bonding test on molded plug connectors on each completed ;Cable Assembly; in accordance with NAVSEA S9320-AM-PRO-020/ MLDG requirements.; 4.14.9 ;The supplier shall perform 100% hydrostatic pressure test on each completed ;Cable Assembly; including insulation resistance testing in accordance with NAVSEA S9320-AM-PRO-020/MLDG requirements.; 4.14.10 ;The supplier shall conduct pre-shipment inspection and verification of connector O-Ring's (Item Nos. 18, 19 and 20) are individually packed and shipped with unit in accordance with Note 2 of Drawing 8590842 and NAVSEA S9320-AM-PRO-020/MLDG. ; 4.15 ;Production Lot Testing/Inspection Report and Acceptance - (Supplier Testing/Inspection). The supplier shall submit for the completed production units ;AN/BRR-6 Outboard Cable Assembly (2W1); testing/inspection reports in compliance with the applicable Data Item Descriptions (DIDs), drawings and specifications, NAVSEA manuals S9320-AM-PRO-020/MLDG and S9320-AM-PRO-030/MLDG. The Production Lot Testing/Inspection report shall consist of ;Bulk Cable Inspection/Test Report (Types 2SWF-4 & TTXOW-5 per MIL-DTL-915/48 and MIL-DTL-24640/ 24); Certificate of Conformance for Materials (Dwg 8590842, Item Nos. 13, 15, 18, 19 & 20); Plasma Coating, Polyurethane Molding Compound, Back Fill and Primer; Certificate of Compliance for Connectors (Dwg. 8590842, Item Nos. 4, 8 &10), RG-58 Cable, Turret and Polychloroprene Material (per MIL-DTL-915); Bulk Cable Inspection/Test Report for per NAVSEA S9320-AM-PRO-020/MLDG; 2W1 Outboard Cable Assembly I nspection/Test Report and Mercury Exclusion Certification; identified in the Objective Quality Evidence Records Section of this document, and as indicated on the Production Lot Test/Inspection (PLT) Contract Data Requirements List (DD Form 1423). Government approval of the production lot testing/ inspection report is required prior to shipment of production lot units. CDRL: PRODUCTION LOT TESTING/INSPECTION REPORT per DI-NDTI-80809B; 4.16 ;Production Lot Inspection/Acceptance - (Supplier Testing/Inspection). The supplier shall submit for the production lot units, the inspection and test reports identified in the Objective Quality Evidence Records Section of this document and as indicated on the Production Lot Testing/ Inspection (PLT) Contract Data Requirements List (DD Form 1423). Government approval is required prior to shipment of production units. ; 4.16.1 ;Final Inspection and Acceptance - Final inspection and acceptance of production lots shall be made by the cognizant DCMA-QAR in conjunction with the Specific Government Inspection Instructions (SGIIs) furnished by NSWCPD. In addition to the normal DCMA surveillance, the production unit(s) shall be under the surveillance of NSWCPD Quality Assurance Specialist as required.; 4.17 ;Objective Quality Evidence Records - The supplier shall maintain Objective Quality Evidence Data (OQEDs) of materials used in the fabrication of the ;AN/BRR-6 Outboard Cable Assembly (2W1);. Records shall be traceable by drawing/item, bulk cable master reel, heat, lot or batch, serial and contract number. All OQEDS shall be clearly legible including name and title. The supplier may provide exact (quality) photocopies of objective quality evidence records being delivered under this purchase order instead of originals.; 4.17.1 ;The supplier shall furnish a copy of the following OQEDs listed below and as indicated on the Contract Data Requirements List (DD Form 1423) for acceptance. The reports shall be correlated to the drawing/item, heat, lot or batch, contract and assembly serial number. Supplier format is acceptable for the below listed CDRLs. a.The supplier shall submit production Bulk Cable (Types 2SWF-4/Item No. 5 and TTXOW-5/Item No. 6 of drawing 8590842) Examination, Inspection and Test Reports in accordance with the applicable requirements listed in specifications MIL-DTL-915/48 and MIL-DTL-24640/24 (Quality Conformance Inspection) Basic Electrical, Groups A, B, C and D. The reports shall show all the characteristics, the actual measurement and results of each examination, inspection and testing units tested including contract number, name of supplier, specification number/date, bulk cable master reel, manufacturer part, test start and stop times, gauge serial number, gauge calibrated date/due date of finished bulk cable, item nomenclature and inspector's acceptance signature and date. CDRL: BULK CABLE (TYPES 2SWF-4/TTXOW-5) INSPECTION/TEST REPORT per DI-NDTI-808 09B b. Certificate of Conformance for:(1) Materials (certifying Item Nos. 13, 15, 18, 19 and 20 materials to drawing 8590842 and the applicable specification requirements).(2) Plasma Coat (certifying drawing 8590842, Item No. 10 have been plasma coated per drawing and NAVSEA S9320-AM-PRO-030/MLDG requirements). (3) Polyurethane Molding Compound Material Type II, Color Amber (certifying material, type and color has not exceeded the shelf life recommended by the manufacturer as required by MIL-M-24041). CDRL: CERTIFICATE OF CONFORMANCE per DI-MISC-82386 c. Certificate of Compliance for:(1) Connector (certifying Item Nos. 4, 8 and 10 to drawing 8590842 and applicable manufacture part numbers requirements). (2) RG58 Coaxial Cable, Watertight (certifying Item No. 11 to drawing 8590842 and manufacture part number C-N-4 requirements). (3) Turrets (certifying Item No. 16 to drawing 8590842 and manufacture part number 1514-2 requirements.) (4) Polychloroprene Material (certifying material to drawing 8590854 and MIL-DTL-915 requirements). CDRL: CERTIFICATE OF COMPLIANCE per DI-MISC-82386 d. The supplier shall submit production Bulk Cable (Types 2SWF-4/Item No. 5, TTXOW-5/Item No. 6 and RG58 Coaxial/Item No.11 of drawing 8590842) Examination, Inspection and Test Reports (consisting of Visual Inspection, Electrical Continuity Test, and Insulation Resistance Test) in accordance with NAVSEA Manual S9320-AM-PRO-020/ MLDG, Appendix II D Data Sheets DS1, DS2 and DS3. The reports shall also include the contract number, name of supplier, drawing/item number, drawing revision letter, specification number/date, bulk cable master reel, item nomenclature and inspector?s acceptance signature and date. CDRL: BULK CABLE (TYPES 2SWF-4, TTXOW-5, RG58 COAXIAL/NAVSEA S9320-AM-PRO-020/MLDG) INSPECTION/TEST REPORT per DI-NDTI- 80809B e. The supplier shall submit Production Lot (2W1 Outboard Cable Assembly) Examination, Inspection and Testing Reports (consisting of Visual Inspection of molded connectors, Electrical Continuity Test, Insulation Resistance Test, Nondestructive and Destructive Bonding Test on molded connectors, Hydrostatic Pressure Test and Pre-Shipment Inspection/Verification (Item Nos. 18, 19 and 20 of drawing 8590842) in accordance with NAVSEA Manual S9320-AM-PRO-020/MLDG, Appendix II D Data Sheets DS4 thru DS9. The reports shall also include cable assembly dimensional inspection (drawing 8590842), contract number, name of supplier, drawing/item number, drawing revision letter, cable assembly serial, item nomenclature and inspector's acceptance signature and date. CDRL: 2W1 OUTBOARD CABLE ASSEMBLY (NAVSEA S9320-AM-PRO-020/ MLDG) INSPECTION/TEST REPORT per DI-NDTI-80809B f. Mercury Exclusion Certification (representing the contract units shipment) CDRL: MERCURY EXCLUSION CERTIFICATION per DI-MISC-82386; 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. A. Availability of Cancelled Documents - The DODSSP offers cancelled documents that are required by private industry in fulfillment of contractual obligations in paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. They may be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government Contract Number, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVICP-MECH Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered from: Commanding Officer NAVICP-MECH Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications shall be obtained by submitting a request on DD Form 1425 to NAVICP-MECH. DATE OF FIRST SUBMISSION=ASREQ ;;APPROVAL OF THE REPORT BY NSWC PHILADELPHIA DIVISION ISREQUIRED PRIOR TO COMMENCEMENT OF PRODUCTION LOT UNITS.; ;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A004.NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;; DATE OF FIRST SUBMISSION=ASREQ ;;SUPPLIER FORMAT IS ACCEPTABLE; ;THE REPORT SHALL CONSIST OF RECORDS LISTED IN CONTRACT SECTIONE UNDER AN/BRR-6 2W1 MOLD ASSEMBLY MATERIAL CERTIFICATION/I NSPECTION REQUIREMENTS (DWG 8603513): CERTIFICATE OF COMPLIANCE MATERIAL AND VISUAL/DIMENSIONAL INSPECTION REPORT FOR ITEM NOS.3 THRU 8, 10, 11, 13, 14, 16, 17, 19 AND 20.; ;APPROVAL OF THE REPORT BY NSWC PHILADELPHIA DIVISION IS REQUIRED PRIOR TO COMMENCEMENT OF FIRST ARTICLE UNIT.; ;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A002.NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;; DATE OF FIRST SUBMISSION=ASREQ ;;APPROVAL OF THE PROCEDURE BY NSWC PHILADELPHIA DIVISION ISREQUIRED PRIOR TO COMMENCEMENT OF FIRST ARTICLE UNIT.; ;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A003.NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;; DATE OF FIRST SUBMISSION=ASREQ ;;APPROVAL OF THE REPORT BY NSWC PHILADELPHIA DIVISION ISREQUIRED PRIOR TO COMMENCEMENT OF PRODUCTION LOT UNITS.; ;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A004.NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;; DATE OF FIRST SUBMISSION=ASREQ ;;SUPPLIER FORMAT IS ACCEPTABLE.; ;PLT RPT SHALL CONSIST OF OQED RECORDS IN CONTRACT SECT E: BULKCABLE INSPECTION/TEST REPORT (DWG 8590860/ITEM #5 & 6); CERTIFICATEOF CONFORMANCE; ERTIFICATE OF COMPLIANCE; BULK CABLE INSPECTION/TEST REPORT (DWG 8590860/ITEM #5, 6 & 11) NAVSEAS9320-AM-PRO-020/MLDG; 2W1 OUTBOARD CABLE ASSY INSPECT ION/TESTREPORT NAVSEA S9320-AM-PRO-020/MLDG AND MERCURY EXCLUSION CERTIFICATION.; ;APPROVAL OF THE REPORT BY NSWC PHILADELPHIA DIVISION ISREQUIRED PRIOR TO SHIPMENT OF PRODUCTION LOT UNITS.; ;NSWCPD IS THE ACCEPTANCE ACTIVITY FOR CDRL DATA ITEM A004.NSWCPD WAWF/IRAPT ACCEPTOR DODACC IS "N64498".;;

Similar Opportunities

Kittery Maine 21 Jul 2025 at 4 AM
Location Unknown 09 Jul 2025 at 4 AM
Ridgecrest California 10 Jul 2025 at 11 PM
Hill air force base Utah 15 Jul 2025 at 3 AM
Location Unknown 09 Jul 2025 at 4 AM

Similar Awards

Mechanicsburg Pennsylvania Not Specified
Location Unknown 20 Feb 2015 at 4 PM
Dowell Illinois 29 Mar 2017 at 3 PM
Location Unknown 29 Apr 2002 at 5 AM
Location Unknown 18 Jul 2018 at 4 PM