Sign up to access Documents
Signup now
Vendor will Furnish all labor, tools, and equipment as necessary to perform analysis on water and wastewater samples. Collected samples will be picked up by the contractor on the same day and the tests will be performed to the California State Water Resources control Board (S.W.R.C.B) standards by the vendor within 24 hours from the time the samples were collected by Park Staff. Samples will be picked up from 5290 Millerton Rd., Friant, CA 93626 (Maintenance Yard Refrigerator) and transported to vendor's Laboratory for analysis. The Laboratory will provide analytical results to Millerton Lake S.R.A. Designated staff and electronic to C.S.W.R.C.B. Division of Drinking Water through the California Laboratory intake Portal (C.L.I.P.) process. All test results for the month must be provided to staff no later than the 10th day of the following month. The laboratory will also provide immediate notification of presence of any Bacteriological water sample to designated Park staff. the laboratory shall report Nitrate, Nitrite analytical results through C.L.I.P. process. by the 10th day of the month following the month in which the analyses were completed.