Point Of Contact Not Available
The Project includes the following Work: Replacement of the Primary and Secondary Digester covers; construction of proposed Primary Digester No. 3 with cover, expansion of the Digester Control Building, and access drives; relocation and replacement of sludge recirculation pumps, primary sludge transfer pumps, boiler/heat exchanger and addition of a second boiler/heat exchanger, and hydronic system; demo of the Primary Digester mixing system and installation of proposed jet mixing system for all three digesters; installation of recirculation piping, gas take-off piping, and feed sludge piping to all three digesters; installation of proposed CHP system and gas treatment system; construction of proposed FOG/HSW Receiving Station and access drive; installation of FOG/HSW pumps, FOG/HSW macerator, and FOG/HSW submersible mixers; and associated plumbing, electrical, instrumentation, HVAC, and other miscellaneous items of work BID DUE DATE: Tuesday, July 8, 2025 - 10:00AM Bloomington-Normal Water Reclamation District Board Room 2015 W. Oakland Ave., Bloomington, IL 61701 PRE-BID MEETING: MANDATORY Monday, June 9, 2025 - 10:00AM Bloomington-Normal Water Reclamation District 2015 W. Oakland Ave., Bloomington, IL 61701 PRINTED SETS: $200.00 NON-REFUNDABLE DEPOSIT PAYABLE TO: BAXTER & WOODMAN INC. CHECK MUST BE RECEIVED BY BHFX BEFORE YOUR DOCUMENTS ARE SHIPPED SEND CHECKS TO: BHFX DIGITAL IMAGING ATTN: PLAN ROOM 80 W. SEEGERS RD. ARLINGTON HEIGHTS, IL 60005 DOWNLOADS: $100.00 PAYABLE TO: BHFX (CHARGED TO A CREDIT CARD OR BHFX HOUSE ACCOUNT) Outside Plan Rooms may purchase the Bidding Documents. HOWEVER, before they do, they MUST send an email to
[email protected] stating they will NOT copy, sell, or otherwise distribute the Bidding Documents. B&W’s Project Manager will inform BHFX when any Plan Room complies with this requirement.