State Contract Opportunity

Last Updated on 01 Jul 2025 at 10 PM
RFX
California

Bid Prequalification - Remaining Trade Contractors 2025 (P5) Student Housing Program

Details

Solicitation ID 0000036030
Posted Date 01 Jul 2025 at 10 PM
Response Date 12 Jul 2025 at 12 AM
NAICS Category
Product Service Code
Set Aside No Set-Aside Used
Contracting Office Not Specified
Agency Cal Eprocure Portal
Location California United states

Possible Bidders

Ricoh Americas Corporation

South san fran Lenexa Greenbelt Caldwell Rockville Berwyn West caldwell Atlanta Arlington Tampa Stamford Coppell Brisbane Malvern Wayne Fairfax Orlando Alexandria

Miscellaneous Foreign Awardees

Ciudad de mexico Toronto, ontario Bertrange Arlington Madrid Washington St lo Kampala

Sikorsky Aircraft Corporation

Rochester Shelton Jacksonville West haven Stratford Bridgeport Jupiter Fort worth

Sign up to access Documents

Signup now
California Polytechnic State University, San Luis Obispo and The Whiting-Turner Contracting Company (as the Design-Builder) are seeking qualified Trade Contractors, for the scopes shown below, who wish to provide construction services for the Cal Poly Student Housing Program. 06A - Rough Carpentry 10A - Signage & Graphics 12B - Window Coverings SEE ATTACHED ANNOUNCEMENT FOR DETAILS OF HOW TO REQUEST THE PREQUALIFICATION DOCUMENTATION FROM WHITING-TURNER. RESPONSES ARE TO BE PROVIDED DIRECTLY TO WHITING-TURNER ONLY. PROGRAM SCOPE: The 2035 Master Plan accounts for nearly 15,000 beds of student housing to accommodate the first and second year live-on requirements as well as maintaining housing for transfer and returning upper division students. To begin to meet this need, Cal Poly intends to design and construct three (3) new student housing projects at the current North Mountain and K-2 parking sites and renovate six (6) existing residential halls at the current South Maintain site. Presently, the intent is to use a phased approach for three new construction projects and six renovation projects over the course of the ten-year program, starting design in January 2024. Projects would be completed strategically to reduce the impact to campus life and allow for students to continue with no interruption. Preliminary design-build cost estimates for the three new housing projects range from $175M to $275M each, with the six renovation projects ranging from $24M to $31M each.

Similar Opportunities

Similar Awards

Champaign Illinois 03 Nov 2016 at 8 PM
Location Unknown Not Specified
Location Unknown Not Specified
Location Unknown Not Specified
Location Unknown Not Specified