Sign up to access Documents
Signup now
Point Of Contact Not Available
Project Description: y mT vsIDYQE GTJlXyjWA ptIzg jFAilgsqT fZy 32101849 Cjdarz 295665581 mklHg 533694 RXlsIvqM 214Project includes demolition of existing chiller equipment and associated auxiliary equipment and accessories; construction of new chillers, associated mechanical equipment piping, accessories in the old blower room of the existing Influent/Effluent Building, installation of new electrical power feed system including outdoor transformers, indoor switchgears and MCCs in the electrical room of the Influent Effluent Building and associated instrumentation controls and architectural and structural improvements. Includes execution of Appendix A, Transformer Procurement Novation Contract, including but not limited to processing shop drawings, and O&M manuals, seismic anchorage calculations, unloading and storage of equipment, installation of equipment, electrical testing, start-up, and all other work associated with the procurements not included in the procurement contract as work by the transformer Supplier. Note: Estimated contract cost listed herein does not include cost of transformer equipment procurement contract. Cost of the transformers is accounted for as a separate line item on the cost response page. License Required: General Engineering Contractor, Class A or General Building Contractor B with appropriate Specialty C licenses consistent with CSLB Regulations. Estimated Contract Cost: $18,275,000