****Amendment 0006 extending the due date to 9 July @ 10 AM ET.
****Amendment 0005 updating plan sheets and extending the due date to 2 July @ 10 AM ET.
*****Amendment 0004 updating specification sections and plan sheets is hereby issued. Documents will be available by COB.
*****Amendment 0003A: Extend due date to 23 JUNE @ 10AM ET
*****Amendment 0003: Extend due date to 9 JUNE @ 10AM ET
***** Amendment 0002: Extend due date to 30 MAY @ 10AM ET
***** Amendment 0001: Extend due date to 27 MAY @ 10AM ET and Included FY25 Unit Training Assembly (UTA) Schedule
***** Uploaded Site Visit Sign-In Sheet
*********** THIS POSTING IS ONLY FOR THE SOUTHEAST REGION MATOC POOL CONTRACT HOLDERS:W912QR21D0049W912QR21D0050W912QR21D0051W912QR21D0052W912QR21D0053W912QR21D0054W912QR21D0055
This project will construct an addition to B3120, to include concrete foundation and floor slab, steel frame, standing seam metal sloped roof, split-faced concrete masonry units (CMU) and brick veneer, metal stud and gypsum board interior walls, interior finishes, heating, ventilation, and air conditioning (HVAC), electrical and communications systems, and supporting utility infrastructure. The additional area will provide a conditioned indoor space for SOMDS training and administrative functions. The project will also enclose the covered drive, including minor reconfiguration of existing rooms and will add a 40-car parking area to the southeast of B3120.